Precise setting-out, survey control and as-built surveys provided during the construction life-cycle.

Project Scope

Apex Surveys were commissioned to carry out engineering surveys for the construction of new manufacturing plant at large tech facility in the greater Dublin area.

Survey crews were provided on an on-going basis for duration of the build.

Scope included precise setting out of civil and building works at the construction stage, provision and update of survey control and as-built drawings as the construction developed.

Our Solution

  • Working both internally and in clean room environment
  • Comprehensive health and safety procedures implemented
  • Comprehensive control network established throughout the facility
  • Setting out of columns, holding down bolts for steel structures and positioning of pipe racks etc
  • As-built Surveys revised as construction developed
  • Cut and fill volumes calculated for excavations
  • Underground Utility Surveys

Survey Outputs

  • Setting Out services
  • High precision control networking
  • As-built surveys
  • Volumes