)
1 Georges Quay Redevelopment Project
BIM Model and CAD drawings produced for the redevelopment of 1GQ.
)
BIM Model and CAD drawings produced for the redevelopment of 1GQ.
)
Heritage LOD Floor Plans, Elevations and Sections delivered for the Ballintubber Abbey Restoration Project.
)
Mobile Mapping to produce a topographic survey at the Bundoran to Ballyshannon Greenway Project.
)
Topographic and Underground Utility Survey for the BusConnects Dublin project.
Underground Utility Survey for BRT.
)
Hydrographic Survey of watercourses across Ireland for the CFRAMS Programme.
Surveys for the Cherrywood Development.
)
Rail Gauge, Topographic and Underground Utility Survey for the Cork Area Commuter Rail Programme.
)
Underground Utility Survey airside at Dublin Airport.
)
Reality Capture of heritage assets at the MetroLink project.
)
Next-Day response and monitoring provided for emergency works for Graveyard at Howth Abbey.
)
BIM Model and digital drawings produced to facilitate redevelopment and refurbishment works at Irish Life HQ.